Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
Elena Katok, Holly S. Lewis, Terry P. Harrison
인용
- 주제생산 계획과 일정 · 생산·최적화
We introduce a heuristic method for finding good, feasible solutions for multiproduct lot sizing problems with general assembly structures, multiple constrained resources, and nonzero setup costs and setup times. We evaluate the performance of this heuristic by comparing its solutions to optimal solutions of small randomly generated problems and to time-truncated Optimization Subroutine Library (OSL) solutions of medium-sized randomly generated problems. In the first case, the heuristic locates solutions averaging 4 percent worse than optimal in less than 1 percent of time required by OSL. The heuristic solutions to medium-sized problems are approximately 26 percent better than solutions OSL finds after 10,000 CPU seconds, and the heuristic finds these solutions in approximately 10 percent of OSL time.
불러오는 중…
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Capacitated Lot Sizing with Setup Times
- Lot-Sizing with Start-Up Times
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Economic Lot Size Determination in Multi-Stage Assembly Systems
- A Dual Ascent and Column Generation Heuristic for the Discrete Lotsizing and Scheduling Problem with Setup Times
- Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines
아직 이 논문을 인용한 탑저널 논문이 없습니다.
15 / 28편
- Dynamic Version of the Economic Lot Size Model
- Deterministic Production Planning: Algorithms and Complexity
- Computational Complexity of the Capacitated Lot Size Problem
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- Capacitated Lot Sizing with Setup Times
- Improved Heuristics for Multi-Stage Requirements Planning Systems
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- Solving Multi-Item Lot-Sizing Problems Using Strong Cutting Planes
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 44(6) · 859–877
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.44.6.859
- 저자Elena Katok, Holly S. Lewis, Terry P. Harrison