This paper addresses the problem of planning and controlling (through resource allocation decisions) projects under conditions of uncertainty. Particular attention is given to the dynamic reallocation of resources over the duration of projects as information about actual activity times becomes known. The effect of resource allocations on an activity is represented, by modifications in the probability function of the time to process that activity. Analytic procedures such as dynamic programming and distribution analysis, which might lead to optimal dynamic decision rules, are shown to be computationally intractable even for very small problems. For a set of project networks of relatively simple structure, the efficacy of several heuristic decision rules is tested via simulation. The results of these simulation studies indicate some general concepts that should be applicable to the management of larger, more realistic, projects.
불러오는 중…
- Total Cost Control in Project Management via Satisficing
- A Chance-Constrained Model for Real-Time Control in Research and Development Management
- Individual Decisions Concerning the Allocation of Resources for Projects with Uncertain Consequences
- Managing Uncertain Capacities for Network Revenue Optimization
- A Heuristic Model for Scheduling Large Projects with Limited Resources
- Dynamic Programming Models of the Nonserial Critical Path-Cost Problem
- Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions
- On Uncertainty, Ambiguity, and Complexity in Project Management
- Chance-Constrained Programming
- Optimal Funding Paths for a Class of Risky R&D Projects
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- Free For All—Guest Editorial: L'Histoire de Grandeur et de la Dćadence de la Méthode PERT
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 24(3) · 249–258
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.24.3.249
- 저자John M. Burt