Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions
인용
84
피인용
0.0
FWCI
3
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
- 주제네트워크 흐름 최적화 · 생산·최적화
01Abstract
This paper describes a conceptual model which allocates resources in a PERT network, the activities of which are subject to continuous concave-upward time-cost functions, in such a way as to achieve a minimum cost solution for a given completion date for the program described by the network. A parametric solution for the minimum cost solution at various total program times is also briefly described. The effect of uncertainty in the time of completion of an activity has also been investigated in a highly simplified model; and a tentative conclusion is presented that such uncertainty tends to divert resources toward the earlier part of the program, as compared to the solution under certainty.
02연구 흐름
불러오는 중…
03비슷한 논문
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Risk-Taking in Critical Path Analysis
- Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities
- A Statistical Theory for Pert in Which Completion Times of Activities are Inter-Dependent
- Optimal Time-Cost Trade-Offs in GERT Networks
- Better Estimation of PERT Activity Time Parameters
- Planning and Dynamic Control of Projects under Uncertainty
- A Dynamic Programming Solution to Cost-Time Tradeoff for CPM
- On the Expected Duration of PERT Type Networks
04이후 연구
05선행 연구
- A Network Flow Computation for Project Cost Curves
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 10(4) · 734–745
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.10.4.734
- 저자Edward B. Berman