R&D Project Planning with Q-GERT Network Modeling and Simulation
Bernard W. Taylor, Laurence J. Moore
인용
- 주제연구개발 투자와 자원 배분 · 기업전략·혁신
This paper describes a simulation study of two cases of research and development planning. The first case is for a series of R&D projects analyzed sequentially by a single R&D team, while the second case is for a series of R&D projects analyzed sequentially and concurrently by two teams. Q-GERT, a network technique, was employed for the modeling and simulation effort. This technique includes numerous network modeling capabilities which make it more applicable to R&D project planning than traditional network techniques such as CPM and PERT. The simulation results for each case in terms of project duration statistics and outcome probabilities are presented in detail. The trade-offs between the two cases (i.e., single team versus multiple team analysis) are discussed.
불러오는 중…
- Multiteam, Multiproject Research and Development Planning with GERT
- GREMEX—A Research and Development Management Simulation Exercise
- Optimal Time-Cost Trade-Offs in GERT Networks
- Representation and Analysis of Multi-Stage Problems in R & D
- Optimal Sequencing and Resource Allocation in Research and Development Projects
- An Experimental Analysis of Network Planning
- An Extensible Visual Environment for Construction and Analysis of Hierarchically-Structured Models of Resource Contention Systems
- Factors Affecting Adoption of a Quantitative Method for R&D Project Selection
- Parallel Funding of R&D Tasks with Probabilistic Outcomes
- Planning and Dynamic Control of Projects under Uncertainty
- Multiteam, Multiproject Research and Development Planning with GERT
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 26(1) · 44–59
- 토픽Team Dynamics and Performance · Social Psychology
- DOI10.1287/mnsc.26.1.44
- 저자Bernard W. Taylor, Laurence J. Moore