Optimal time-cost trade-offs in deterministic networks of the CPM-type have been neatly resolved by Fulkerson. In the case of GERT-type networks, the problem is complicated by the randomness in the duration of the activity and in the likelihood of its existence. Assuming linear relationships between additional investments and expected duration and additional cost, a model is formulated in which we seek the maximization of the marginal reduction in duration per unit of investment. This, in turn, leads to a fractional linear program whose solution is obtained easily.
02연구 흐름
불러오는 중…
03비슷한 논문
- Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions
- Multiteam, Multiproject Research and Development Planning with GERT
- A Dynamic Programming Solution to Cost-Time Tradeoff for CPM
- On the Expected Duration of PERT Type Networks
- R&D Project Planning with <i>Q</i>-GERT Network Modeling and Simulation
- The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)
- Solving Generalized Networks
- A Simple CPM Time-Cost Tradeoff Algorithm
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Better Estimation of PERT Activity Time Parameters
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
06서지 정보
- 저널Management Science · 18(11) · 589–599
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.18.11.589
- 저자Sanji Arisawa, Salah E. Elmaghraby