822
피인용
15.5
FWCI
5
IS/마케팅/OM 탑저널 피인용
16
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
In this paper, we propose a branch and bound method for solving the job-shop problem. It is based on one-machine scheduling problems and is made more efficient by several propositions which limit the search tree by using immediate selections. It solved for the first time the famous 10 × 10 job-shop problem proposed by Muth and Thompson in 1963.
02연구 흐름
불러오는 중…
03비슷한 논문
- Scheduling the General Job-Shop
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- A Fast Taboo Search Algorithm for the Job Shop Problem
- Job-Shop Scheduling by Implicit Enumeration
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- An Integrated Model for Job-Shop Planning and Scheduling
- A Broader View of the Job-Shop Scheduling Problem
- Heuristics in Job Shop Scheduling
- Note. Satisfying Due Dates in Large Job Shops
- New Search Spaces for Sequencing Problems with Application to Job Shop Scheduling
04이후 연구
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- Guided Local Search with Shifting Bottleneck for Job Shop Scheduling
- Three Scheduling Algorithms Applied to the Earth Observing Systems Domain
- ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling
- Note. Satisfying Due Dates in Large Job Shops
05선행 연구
15 / 16편
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Scheduling the General Job-Shop
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 35(2) · 164–176
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.35.2.164
- 저자Jacques Carlier, Éric Pinson