IS Atlas
ms·1995년 1월 1일

The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling

Egon Balas, Jan Karel Lenstra, Alkis Vazacopoulos

Management Science

138
피인용
33.0
FWCI
2
IS/마케팅/OM 탑저널 피인용
8
IS/마케팅/OM 탑저널 참고문헌
01Abstract

We study the one machine scheduling problem with release and delivery times and the minimum makespan objective, in the presence of constraints that for certain pairs of jobs require a delay between the completion of the first job and the start of the second (delayed precedence constraints). This problem arises naturally in the context of the Shifting Bottleneck Procedure for the general job shop scheduling problem, as a relaxation of the latter, tighter than the standard one-machine relaxation. The paper first highlights the difference between the two relaxations through some relevant complexity results. Then it introduces a modified Longest Tail Heuristic whose analysis identifies those situations that permit efficient branching. As a result, an optimization algorithm is developed whose performance is comparable to that of the best algorithms for the standard one-machine problem. Embedding this algorithm into a modified version of the Shifting Bottleneck Procedure that uses the tighter one-machine relaxation discussed here results in a considerable overall improvement in performance on all classes of job shop scheduling problems.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보