Mixed‐model assembly lines with variable takt and open stations
Arnd Huchzermeier, Tobias Mönch
Production and Operations Management
인용
- 주제생산 계획과 일정 · 생산·최적화
- 방법
- 현상
Industry trends such as product customization, radical innovation, and local production accelerate the adoption of mixed‐model assembly lines (MMALs) that can cope with a widening gap between model processing times and true build to order capabilitiy. The existing high work content deviations on such assembly lines stress production planning, especially the assembly line sequencing. Most manufacturers set the launching rate for all assembly line products to a fixed launching rate resulting in rising utility work and idle time when system load increases. We present an “ideal” variable rate launching (VRL) case resulting in minimal computation and achieving 100% productivity (full elimination of idle time and utility work) for balanced assembly times and homogeneous station lengths. Managers should foster the ideal circumstances where operators need not wait for a preceding task to be completed and product sequence restrictions are eliminated, thus enabling unmatched production flexibility. Furthermore, we present a mixed‐integer model to analyze both closed and open workstations on an MMAL for fixed rate launching and VRL. This model incorporates costs not only for labor inefficiencies but also for extending the line length. We present a heuristic solution method when process times and station lengths are heterogeneous and demonstrate that the variable takt dominates the fixed takt. In a numerical, industrial benchmark study, we illustrate that a VRL strategy with open stations has significantly lower labor costs as well as a substantially reduced total line length and thus lower throughput time.
불러오는 중…
초록이 없어 비슷한 논문을 찾지 못했습니다
아직 이 논문을 인용한 탑저널 논문이 없습니다.
15 / 52편
- OM Forum—Benchmarking Global Production Sourcing Decisions: Where and Why Firms Offshore and Reshore
- Line Balancing-Sequencing for Mixed-Model Assembly
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- Sequencing to Minimize Work Overload in Assembly Lines with Product Options
- Mixed-Model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Production and Operations Management · 32(3) · 704–722
- 토픽Assembly Line Balancing Optimization · Industrial and Manufacturing Engineering
- DOI10.1111/poms.13893
- 저자Arnd Huchzermeier, Tobias Mönch