This article describes an algorithm for efficiently shortening the duration of a project when the expected project duration exceeds a predetermined limit. The problem consists of determining which activities to expedite and by what amount. The objective is to minimize the cost of the project. This algorithm is considerably less complex than the analytic methods currently available. Because of its inherent simplicity, the algorithm is ideally suited for hand computation and also is suitable for computer solution. Solutions derived by the algorithm were compared with linear programming results. These comparisons revealed that the algorithm solutions are either (a) equally good or (b) nearly the same as the solutions obtained by more complex analytic methods which require a computer. With this method the CPM time-cost tradeoff problem is solved without access to a computer, thereby making this planning tool available to managers who otherwise would find implementation impractical.
불러오는 중…
- A Dynamic Programming Solution to Cost-Time Tradeoff for CPM
- Note—A Note on “A Simple CPM Time-Cost Tradeoff Algorithm”
- Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Dynamic Programming Models of the Nonserial Critical Path-Cost Problem
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Optimum Time Compression in Project Scheduling
- Dynamic Project Expediting: A Stochastic Shortest-Path Approach
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- A Branch and Bound Algorithm for Minimizing Cost in Project Scheduling
- A Network Flow Computation for Project Cost Curves
- A Structural Method of Computing Project Cost Polygons
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 17(6) · B–354
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.17.6.b354
- 저자Nicolai Siemens