57
피인용
0.8
FWCI
0
IS/마케팅/OM 탑저널 피인용
6
IS/마케팅/OM 탑저널 참고문헌
- 주제시뮬레이션 기법 · 의사결정분석
01Abstract
A maximum entropy approach leads to a truncated normal distribution for the activity time in PERT analysis. Three different methods of fit are discussed, and a comparison with the standard assumption of a Beta distribution is made. The results suggest new ways of performing the PERT analysis.
02연구 흐름
불러오는 중…
03비슷한 논문
- Better Estimation of PERT Activity Time Parameters
- Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities
- Reply—A Note on PERT Assumptions
- On the Expected Duration of PERT Type Networks
- A Statistical Theory for PERT Critical Path Analysis
- A Statistical Theory for Pert in Which Completion Times of Activities are Inter-Dependent
- Estimating the Mean and Variance of Subjective Distributions in PERT and Decision Analysis
- Judgment Estimates of the Moments of Pert Type Distributions
- The Use of the Compound Poisson in Pert
- Approximating the Criticality Indices of the Activities in PERT Networks
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 20(1) · 44–49
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.20.1.44
- 저자Thoddi C. T. Kotiah, N. D. Wallace