PERT and Critical Path techniques are enjoying exceptionally broad application in industrial and military activities. These techniques and their application have without doubt contributed significantly to better planning, control, and general organization of many programs. Although some currently used PERT computations take account of the variation in the completion times of individual operations, the methods used are approximate and are known to lead to (a) optimistic project completion times and (b) misidentifications of “critical paths.” In this paper the effect of these approximations is assessed and an unbiassed statistical distribution theory for PERT developed. Both analytic theory and numerical analysis are used to achieve this but in certain situations approximate evaluations by Monte Carlo have to be made. Moreover, a new classification of PERT networks is presented along with two methods of analysis which do not have the deficiencies noted above. The classification system delineates clearly between “uncrosaed,” “crossed,” and “mixed networks.”
불러오는 중…
- A Statistical Theory for Pert in Which Completion Times of Activities are Inter-Dependent
- Better Estimation of PERT Activity Time Parameters
- Approximating the Criticality Indices of the Activities in PERT Networks
- Numerical Operators for Statistical PERT Critical Path Analysis
- Bias in Pert Project Completion Time Calculations for a Real Network
- On the Expected Duration of PERT Type Networks
- Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities
- On the Analysis of Critical Path Time Estimating Behavior
- Reply—A Note on PERT Assumptions
- Another Look at the PERT Assumptions
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 12(10) · B–469
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.12.10.b469
- 저자H. O. Hartley, A. W. Wortham