This paper illustrates a shift scheduling procedure for a commercial bank's encoder work force for check processing in the presence of daily work load uncertainty. The author presents a chance constraint model for determining the appropriate safety capacity, analogous to safety stock in inventory theory, to meet varying volume demands when forecast errors are present. A series of tests are conducted to evaluate the model's performance under different operating costs, forecast errors, and volume arrival rates, which are based on data collected at Chemical Bank. The results indicate this model provides low cost solutions. This study provides two contributions to managers and management scientists. First, even though the paper illustrates the encoder work force shift scheduling decision, the methodology presented can be extended to other service oriented organizations. The main elements that need to be present are: varying between day work loads, varying within day work loads, uncertainty in estimating work loads, and critical deadlines at specific times during the day. And second, a classification scheme is developed which indicates how the general shift scheduling problem in service organizations can be viewed. This classification system helps to structure this complex problem and indicates how this proposed procedure contributes to this important area.
불러오는 중…
- A Simulation Analysis of Tour-Shift Construction Procedures
- Staffing Call Centers with Uncertain Demand Forecasts: A Chance-Constrained Optimization Approach
- Capacity Sizing Under Parameter Uncertainty: Safety Staffing Principles Revisited
- Managing Flexible Capacity in Service Systems with Worker Shortages
- Data-Driven Appointment-Scheduling Under Uncertainty: The Case of an Infusion Unit in a Cancer Center
- Scheduling with Testing
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Load Forecasting, Priority Sequencing, and Simulation in a Job Shop Control System
- Robust Scheduling to Hedge Against Processing Time Uncertainty in Single-Stage Production
- Synchronous Unpaced Flow Lines with Worker Differences and Overtime Cost
- Chance-Constrained Programming
- Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 25(7) · 623–631
- 토픽Optimization and Mathematical Programming · Control and Systems Engineering
- DOI10.1287/mnsc.25.7.623
- 저자Vincent A. Mabert