ms·1976년 8월 1일
Heuristic Methods for Telephone Operator Shift Scheduling: An Experimental Analysis
Willie B. Henderson, William L. Berry
인용
125
피인용
4.6
FWCI
10
IS/마케팅/OM 탑저널 피인용
6
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
Heuristic methods are presented for scheduling telephone traffic exchange operators to meet demand that varies over a 24-hour operating period. Two types of heuristics are described (1) for determining the work shift types to be considered in preparing an operator shift schedule and (2) for constructing an operator shift schedule from a given set of work shift types. These heuristics are evaluated both in terms of solution quality and computational efficiency, using actual operating data.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Simulation Analysis of Tour-Shift Construction Procedures
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
- Heuristics in Job Shop Scheduling
- Solving Large-Scale Tour Scheduling Problems
- Increasing Service Levels in Conference and Educational Scheduling: A Heuristic Approach
- Job Shop Scheduling with Due Dates and Variable Processing Times
- Some Heuristics for Scheduling Jobs on Parallel Machines with Setups
- Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs
- A Case Study of Encoder Shift Scheduling under Uncertainty
04이후 연구
- Implicit Modeling of Flexible Break Assignments in Optimal Shift Scheduling
- Simple Approaches to Shift, Days-Off and Tour Scheduling Problems
- Sufficient Working Subsets for the Tour Scheduling Problem
- Improved Implicit Optimal Modeling of the Labor Shift Scheduling Problem
- Solving Large-Scale Tour Scheduling Problems
- Optimal Shift Scheduling with Multiple Break Windows
- A Simulation Analysis of Tour-Shift Construction Procedures
- A Case Study of Encoder Shift Scheduling under Uncertainty
- Service Center Staffing with Cross‐Trained Agents and Heterogeneous Customers
- Grammar-Based Integer Programming Models for Multiactivity Shift Scheduling
05선행 연구
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 22(12) · 1372–1380
- 토픽Scheduling and Timetabling Solutions · Management Science and Operations Research
- DOI10.1287/mnsc.22.12.1372
- 저자Willie B. Henderson, William L. Berry