01Abstract
This paper considers the Economic Lot Scheduling Problem: that is, the problem of finding a feasible schedule that allows cyclic production of several products on a single facility so as to minimize holding and set up costs. We consider the case when three products are required to be produced in a given fixed lot size and at regular intervals. We derive a very simple test for existence of a feasible schedule and a method of constructing feasible schedules if one exists. The approach is simpler than the mixed integer programming approach and enumeration schemes currently proposed in the literature and is constructive.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 38(10) · 1482–1494
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.38.10.1482
- 저자Celia A. Glass