To solve the problem of time-cost tradeoff in project management with available models, a choice must be made between heuristic approaches and algorithms based upon restrictive assumptions about the shape of the cost-time functions of the activities. The algorithm presented in this article involves a dynamic-programming approach to determine the allocation which minimizes the duration of the project (critical path). The main advantage of this model is its ability to determine the optimum allocation among activities with arbitrary cost-time functions. Also, computational shortcuts for functions with special properties can be used to increase the efficiency of the model. Objective functions of networks with special structures decompose into sequences of one-dimensional optimization problems. Although some complex networks have objective functions which cannot be fully decomposed, the dimensions of these functions are considerably less than the number of activities involved. If the activities have nonincreasing cost-time functions, an optimal policy can be used to eliminate the usual search procedure for one-dimensional problems which involve minimizing the maximum of stage returns.
불러오는 중…
- A Simple CPM Time-Cost Tradeoff Algorithm
- Dynamic Programming Models of the Nonserial Critical Path-Cost Problem
- Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
- Decomposition of Project Networks
- Optimum Time Compression in Project Scheduling
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Planning and Dynamic Control of Projects under Uncertainty
- Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- A Network Flow Computation for Project Cost Curves
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- A Network Flow Computation for Project Cost Curves
- Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis
- A Simple CPM Time-Cost Tradeoff Algorithm
- Risk-Taking in Critical Path Analysis
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 22(2) · 158–166
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.22.2.158
- 저자Don R. Robinson