01Abstract
Author's Reply to Vergin's Note on the Paper “Lot Size Scheduling on a Single Machine for Stochastic Demand” (Vergin, Roger C. 1976. Note—A note on “Lot size scheduling on a single machine for stochastic demand” by Goyal. Management Sci. 22 823–824).
02연구 흐름
불러오는 중…
03비슷한 논문
- Note—A Note on “Lot Size Scheduling on a Single Machine for Stochastic Demand” by Goyal
- Lot Size Scheduling on a Single Machine for Stochastic Demand
- Note—Author's Reply to Graves' Note on the Paper “Critical Ratio Scheduling: An Experimental Analysis”
- Note—A Note on the Dynamic Lot-Size Model with Uncertainty in Demand and Supply Processes
- Addendum to Stankard and Gupta's Note on Lot Size Scheduling
- Rejoinder—On “A Note on MRP Lot Sizing”
- Note—A Note on the Single-Machine Multi-Product Lot Scheduling Problem
- Authors' Rebuttal to Paper by Ramaswami and Lucantoni
- Note—On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem
- Note—On the Optimality of Sub-Batch Sizes for a Multi-Stage EPQ Model—A Rejoinder
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 22(7) · 824–825
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.22.7.824
- 저자S.K. Goyal