ms·1976년 4월 1일
Note—A Note on the Single-Machine Multi-Product Lot Scheduling Problem
Robert W. Haessler, Steven L. Hogue
인용
75
피인용
10.1
FWCI
6
IS/마케팅/OM 탑저널 피인용
4
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
This note develops a procedure for automatically generating feasible solutions for the single-machine multi-product lot scheduling problem.
02연구 흐름
불러오는 중…
03비슷한 논문
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem
- Scheduling a Multi-Product Single Machine System for an Infinite Planning Period
- Note—On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem
- On the Feasibility of Scheduling Lot Sizes for Two Products on One Machine
- Feasibility of Scheduling Lot Sizes of Three Products on One Machine
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
- Note—On “Production Runs for Multiple Products: The Two-Product Heuristic”
- Lot Size Scheduling on a Single Machine for Stochastic Demand
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
04이후 연구
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Lot Sizing and Sequencing for N Products on One Facility
- On the Feasibility of Scheduling Lot Sizes for Two Products on One Machine
- Production Runs for Multiple Products: The Two-Product Heuristic
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
- Scheduling Economic Lot Size Production Runs
05선행 연구
06서지 정보
- 저널Management Science · 22(8) · 909–912
- 토픽Advanced Manufacturing and Logistics Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.22.8.909
- 저자Robert W. Haessler, Steven L. Hogue