IS Atlas
ms·1973년 7월 1일

Lot Size Scheduling on a Single Machine for Stochastic Demand

S.K. Goyal

Management Science

21
피인용
4.1
FWCI
3
IS/마케팅/OM 탑저널 피인용
4
IS/마케팅/OM 탑저널 참고문헌
01Abstract

This paper presents a method for computing the lot size to be produced each time each product is scheduled for production when all products are produced on a single machine. The method also computes the distribution of lot size for each product. The demand for each product is a stochastic variable with known distribution, distributed independently for nonoverlapping time periods and identically for equal time periods.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보