- 주제생산 계획과 일정 · 생산·최적화
01Abstract
In practice, the economic lot quantity problem and the scheduling problem often are treated separately in production planning. However, when a number of items must be supplied continuously and the same means of production must be employed for several of the items non-concurrently, the “economic lot scheduling problem” may have to be dealt with. Addressing itself to a reduced version of this problem, the article outlines a computational approach to finding a feasible and minimum cost (set-up plus storage) production schedule for a group of items which must be available continuously though produced consecutively in a single production center.
02연구 흐름
불러오는 중…
03비슷한 논문
- Scheduling Economic Lot Size Production Runs
- The Use of an Economic Lot Range in Scheduling Production
- Feasibility of Scheduling Lot Sizes of Three Products on One Machine
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- Programming of Economic Lot Sizes
- Economic Lot Scheduling for Multiple Products on Parallel Identical Processors
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- A Linear Program for Economic Lot Sizes using Labor Priorities
04이후 연구
- Scheduling a Multi-Product Single Machine System for an Infinite Planning Period
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem
- A Simple Method of Determining Order Quantities in Joint Replenishments Under Deterministic Demand
- On the Feasibility of Scheduling Lot Sizes for Two Products on One Machine
- Note—On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem
- Production Runs for Multiple Products: The Two-Product Heuristic
- Lot Size Scheduling on a Single Machine for Stochastic Demand
- Author's Reply to Vergin's Note on the Paper “Lot Size Scheduling on a Single Machine for Stochastic Demand”
- An Analytical Model of a Two-Product, One-Machine, Production-Inventory System
05선행 연구
06서지 정보
- 저널Management Science · 4(3) · 264–291
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.4.3.264
- 저자Jack D. Rogers