Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
Peter J. Billington, John O. McClain
인용
- 주제생산 계획과 일정 · 생산·최적화
This paper introduces a line of research on capacity-constrained multi-stage production scheduling problems. The first section introduces the problem area as it arises from a failure of MRP systems. Then a review of the literature and an analysis of the type of problems that exist are presented in §2. Section 3 outlines linear and mixed integer-linear programming formulations. These formulations compute the required production lead times according to the demands on available capacity, thereby reducing in-process inventory compared to the usual practice in MRP. A discussion of how to use the LP version is included. However, the size of the problems in practice implies that more efficient solution techniques must be found. The final topic of this paper, Product Structure Compression, is introduced as a method to reduce the size of the problem without losing optimality.
불러오는 중…
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- Planning Continuous Production by Linear Programming
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Managing Inventory with Multiple Products, Lags in Delivery, Resource Constraints, and Lost Sales: A Mathematical Programming Approach
- Material Requirements Planning Under Demand Uncertainty Using Stochastic Optimization
- Optimal Multi-Level Lot Sizing for Requirements Planning Systems
- Modelling Practical Lot-Sizing Problems as Mixed-Integer Programs
- Periodic Review Production Models with Variable Capacity, Random Yield, and Uncertain Demand
- Multiproduct Production Scheduling for Style Goods with Limited Capacity, Forecast Revisions and Terminal Delivery
- Adaptive Two-Stage Stochastic Programming with an Analysis on Capacity Expansion Planning Problem
- Capacitated Lot Sizing with Setup Times
- Determining Optimal Reorder Intervals in Capacitated Production-Distribution Systems
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
- Optimal Capacity Expansion Planning When There are Learning Effects
- Material Requirements Planning Under Demand Uncertainty Using Stochastic Optimization
- A Coordinated Production Planning Model with Capacity Expansion and Inventory Management
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- Note—On MRP Lot Sizing
- Stabilized‐Cycle Strategy for Capacitated Lot Sizing with Multiple Products: Fill‐Rate Constraints in Rolling Schedules
- A General Framework for Modeling Production
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
15 / 33편
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
- A Facilities in Series Inventory Model with Nested Schedules
- Economic Lot Size Determination in Multi-Stage Assembly Systems
- Deterministic Production Planning: Algorithms and Complexity
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
- Optimal Multi-Level Lot Sizing for Requirements Planning Systems
- Dynamic Lot Size Models for Multi-Stage Assembly Systems
- Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems
- Lot Sizing and Sequencing for N Products on One Facility
- A Linear Programming Solution to Dynamic Leontief type Models
- Note—On MRP Lot Sizing
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 29(10) · 1126–1141
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.29.10.1126
- 저자Peter J. Billington, John O. McClain