4
피인용
0.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
0
IS/마케팅/OM 탑저널 참고문헌
- 주제학술논쟁과 논평 · 학술논평
01Abstract
A rejoinder to comments to the author's paper Maxwell, W. L. 1970. On sequencing n jobs on one machine to minimize the number of late jobs. Management Sci. 16(5, January) 295–297.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Comment on a Paper of Maxwell
- Note—On the Sequencing of <i>n</i> Jobs on One Machine to Minimize the Number of Jobs Late
- Rejoinder
- Note—On Marketing Strategy and the Optimal Production Schedule—A Rejoinder
- Rejoinder—On “A Note on MRP Lot Sizing”
- Authors' Rebuttal to Paper by Ramaswami and Lucantoni
- On Sequencing <i>n</i> Jobs on One Machine to Minimize the Number of Late Jobs
- Discussion: Sequencing <i>n</i> Jobs on Two Machines with Arbitrary Time Lags
- Note—Sequencing <i>n</i> Jobs on <i>m</i> Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
06서지 정보
- 저널Management Science · 18(11) · 718–719
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.18.11.718
- 저자William Maxwell