Note—Sequencing <i>n</i> Jobs on <i>m</i> Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution

W. Townsend

Management Science

43
피인용
4.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
6
IS/마케팅/OM 탑저널 참고문헌
01Abstract

Each of n jobs is to be sequenced on m machines, with each job having a due date, and we wish to minimise the maximum tardiness of any job. The problem has been solved by Smith [Smith, W. E. 1956. Various optimizers for single-state production. Naval Research Logistics Quarterly 3 59–66] for the case of one machine. This note develops a branch-and-bound method for the general case.