42
피인용
6.0
FWCI
1
IS/마케팅/OM 탑저널 피인용
3
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
An integer programming formulation for the problem of sequencing jobs on a single machine to minimize the number of late jobs is developed. The structure of the formulation is exploited to obtain the easily stated algorithm (previously developed by Moore [5]) for the solution of the problem and then to compare it to other similar allocation problems, among which is the Knapsack problem.
02연구 흐름
불러오는 중…
03비슷한 논문
- An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Note—On the Sequencing of <i>n</i> Jobs on One Machine to Minimize the Number of Jobs Late
- Note—Sequencing <i>n</i> Jobs on <i>m</i> Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late Jobs
- A Comment on a Paper of Maxwell
- Scheduling to Minimize the Number of Late Jobs When Set-Up and Processing Times are Uncertain
- On the <i>N</i>-Job One-Machine, Sequence-Independent Scheduling Problem with Tardiness Penalties: A Branch-Bound Solution
- <i>N</i>-Job, One Machine Sequencing Problems Under Uncertainty
- Minimizing Single-Machine Completion Time Variance
- A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 16(5) · 295–297
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.16.5.295
- 저자William Maxwell