01Abstract
An efficient branch-bound algorithm is presented for solving the n-job, sequence-independent, single machine scheduling problem where the goal is to minimize the total penalty costs resulting from tardiness of jobs. The algorithm and computational results are given for the case of linear penalty functions. The modifications needed to handle the case of nonlinear penalty functions are also presented.
02연구 흐름
불러오는 중…
03비슷한 논문
- The Single Machine Problem with Quadratic Penalty Function of Completion Times: A Branch-and-Bound Solution
- An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Note—Sequencing <i>n</i> Jobs on <i>m</i> Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- On Sequencing <i>n</i> Jobs on One Machine to Minimize the Number of Late Jobs
- Note—On the Single Machine Scheduling Problem with Quadratic Penalty Function of Completion Times: An Improved Branching Procedure
- <i>N</i>-Job, One Machine Sequencing Problems Under Uncertainty
- Single Machine Scheduling with Deadlines to Minimize the Weighted Number of Tardy Jobs
- Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late Jobs
- A Lagrangean Based Branch and Bound Algorithm for Single Machine Sequencing with Precedence Constraints to Minimize Total Weighted Completion Time
- The Single Machine Early/Tardy Problem
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
06서지 정보
- 저널Management Science · 18(6) · B–301
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.18.6.b301
- 저자Jeol Shwimer