IS Atlas
ms·1988년 3월 1일

A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands

Robert C. Leachman, André Gascon

Management Science

인용
73
피인용
6.0
FWCI
1
IS/마케팅/OM 탑저널 피인용
0
IS/마케팅/OM 탑저널 참고문헌
01Abstract

A heuristic scheduling policy is introduced for multi-item, single-machine production systems facing stochastic, time-varying demands. The policy, which we term the dynamic cycle lengths heuristic, integrates feedback control based on the monitoring of inventory levels with the maintenance of economic production cycles. The policy is applied time period by time period to make decisions concerning which items to produce in what quantities during the next time period. These quantities reflect production cycles revised each time period in response to differences between projected and actual inventory levels and in response to changes in demand rates. We extend the basic scheduling policy in order to integrate its use with tactical planning. We also discuss the results of simulation tests of the heuristic against other scheduling policies.

02연구 흐름

불러오는 중…

03비슷한 논문
04이후 연구
05선행 연구

참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.

06서지 정보