The Stochastic Economic Lot Scheduling Problem: Cyclical Base-Stock Policies with Idle Times
인용
- 주제생산 계획과 일정 · 생산·최적화
In this paper we discuss stochastic Economic Lot Scheduling Problems (ELSP), i.e., settings where several items need to be produced in a common facility with limited capacity, under significant uncertainty regarding demands, production times, setup times, or combinations thereof. We propose a class of production/inventory strategies for stochastic ELSPs and describe how a strategy which minimizes holding, backlogging, and setup costs within this class can be effectively determined and evaluated. The proposed class of strategies is simple but rich and effective: when the facility is assigned to a given item, production continues until either a specific target inventory level is reached or a specific production batch has been completed; the different items are produced in a given sequence or rotation cycle, possibly with idle times inserted between the completion of an item's production batch and the setup for the next item. An optimal strategy within the class can be determined, and all relevant performance measures can be evaluated in just a few CPU seconds, using a 486-based PC. We also derive a number of easily computable lower bounds for the optimal cost value and establish a comparison with deterministic ELSPs.
불러오는 중…
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- The Impact of Adding a Make-to-Order Item to a Make-to-Stock Production System
- Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines
- Scheduling Economic Lot Size Production Runs
- Economic Lot Scheduling for Multiple Products on Parallel Identical Processors
- The Strategic Use of Capacity Slack in the Economic Lot Scheduling Problem with Random Demand
- A Computational Approach to the Economic Lot Scheduling Problem
- Strategies for the Probabilistic Lot-Sizing Problem with Service-Level Constraints
- Scheduling the Production of Several Items with Random Demands in a Single Facility
- Multi-Echelon Production Scheduling When Demand is Stochastic
15 / 31편
- Lot Sizes, Lead Times and In-Process Inventories
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Periodic Versus “Can-Order” Policies for Coordinated Multi-Item Inventory Systems
- Variance Effects in Cyclic Production Systems
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- Expected Waiting Time for Nonsymmetric Cyclic Queueing Systems—Exact Results and Applications
- Scheduling the Production of Several Items with Random Demands in a Single Facility
- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 42(6) · 783–796
- 토픽Advanced Queuing Theory Analysis · Management Information Systems
- DOI10.1287/mnsc.42.6.783
- 저자Awi Federgruen, Ziv Katalan