A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
José Fernando Gonçalves, Robert C. Leachman, André Gascon, Zhong K. Xiong
인용
93
피인용
10.3
FWCI
4
IS/마케팅/OM 탑저널 피인용
19
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
An effective scheduling policy known as the Dynamic Cycle Lengths Heuristic was introduced by Leachman and Gascon in 1988 for the multi-item, single-machine production system facing stochastic, time-varying demands. In this article we develop a heuristic scheduling policy for the multi-machine extension of the same problem. We integrate the concepts of the Dynamic Cycle Lengths Heuristic with a nonlinear integer optimization model to obtain an overall scheduling policy that allocates items to machines and schedules production quantities during the next time period. We report promising performance in limited simulation tests of the policy.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Multi-Echelon Production Scheduling When Demand is Stochastic
- Scheduling the Production of Several Items with Random Demands in a Single Facility
- Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources
- Dynamic Scheduling of a Production/Inventory System with By-Products and Random Yield
- The Stochastic Economic Lot Scheduling Problem: Cyclical Base-Stock Policies with Idle Times
- Cyclical Schedules for Capacitated Lot Sizing with Dynamic Demands
04이후 연구
- The Stochastic Economic Lot Scheduling Problem: Cyclical Base-Stock Policies with Idle Times
- The Strategic Use of Capacity Slack in the Economic Lot Scheduling Problem with Random Demand
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
- On the Interaction Between Demand Substitution and Production Changeovers
05선행 연구
15 / 19편
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- Scheduling the Production of Several Items with Random Demands in a Single Facility
- Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 40(11) · 1455–1468
- 토픽Supply Chain and Inventory Management · Management Information Systems
- DOI10.1287/mnsc.40.11.1455
- 저자José Fernando Gonçalves, Robert C. Leachman, André Gascon, Zhong K. Xiong