01Abstract

An effective scheduling policy known as the Dynamic Cycle Lengths Heuristic was introduced by Leachman and Gascon in 1988 for the multi-item, single-machine production system facing stochastic, time-varying demands. In this article we develop a heuristic scheduling policy for the multi-machine extension of the same problem. We integrate the concepts of the Dynamic Cycle Lengths Heuristic with a nonlinear integer optimization model to obtain an overall scheduling policy that allocates items to machines and schedules production quantities during the next time period. We report promising performance in limited simulation tests of the policy.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보