Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
Robert C. Leachman, Zhong K. Xiong, André Gascon, Kwangtae Park
인용
30
피인용
3.3
FWCI
1
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
A heuristic scheduling policy for multi-item, single-machine scheduling systems facing stochastic, time-varying demands was previously introduced by Leachman and Gascon. In this technical note we provide an improvement to the calculations of the policy. Simulation tests of the revised version of the policy indicate that the improvements maintain or enhance customer service while reducing total inventory and setup costs on the order of 1–7%.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
- Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources
- A Note on Economic Lot Sizes for Multi-Purpose Equipment
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling Problem
- Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem
- Cyclical Schedules for Capacitated Lot Sizing with Dynamic Demands
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
- Single-Stage Approximations for Optimal Policies in Serial Inventory Systems with Nonstationary Demand
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 37(9) · 1201–1205
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.37.9.1201
- 저자Robert C. Leachman, Zhong K. Xiong, André Gascon, Kwangtae Park