- 주제작업장 일정 최적화 · 생산·최적화
This study explores the due-date performance of job shop control systems which base job due dates on a time-phased representation of the workload and the machine capacity in the shop. The performance is measured by the mean and the standard deviation of the lateness. Two parameters are used to vary the functioning of the due-date assignment system: a minimum allowance for waiting, denoted by SL, and a maximum fraction of the available capacity allowed for loading, denoted by CLL. The system increases the waiting lime allowance if congestion is observed when loading a new job. The capability of the system to observe congestion is determined by the parameters CLL and SL. Simulation experiments are used to investigate the performance of the assignment system. It is shown that the assignment system performs quite well with respect to reducing the standard deviation of the lateness; the performance is not very sensitive however to the parameter values used; with an expected capacity utilization of 90%, CLL should be set between 0.80 and 1.00 times the mean available capacity and SL should be set between 0.55 and 0.90 times the mean operation waiting time in the shop. The assignment system may also perform well with respect to controlling the mean lateness. If SL is set between 0.55 and 0.75 times the mean expected waiting time in the shop, a constant mean lateness is obtained independent of the utilization of the shop if CLL is set between 0.70 and 0.80 times of the mean available capacity. However, the mean lateness turns out to be quite sensitive to variations in the job-mix of the workload. Finally it is shown that if the values of the assignment parameters are adequate, the mean job lateness is independent of the number of operations in a job. This property can be used to monitor the correctness of the parameter values.
불러오는 중…
- A Simulation Study of Predictable Due-Dates
- A Simulation Study of Operating Policies in a Hypothetical Dual-Constrained Job Shop
- A Methodology for Assigning Minimum Cost Due-Dates
- Due-Dates and Instantaneous Load in the One-Machine Shop
- Sequencing Rules and Due-Date Assignments in a Job Shop
- Due Date Assignment for Production Systems
- Note. Satisfying Due Dates in Large Job Shops
- A Broader View of the Job-Shop Scheduling Problem
- Evaluating Project Scheduling and Due Date Assignment Procedures: An Experimental Analysis
- Alternative Formulation of the Job Shop Problem with Due Dates
- Sequencing Rules and Due-Date Assignments in a Job Shop
- Due-Date Setting and Priority Sequencing in a Multiclass M/G/1 Queue
- Quoting Customer Lead Times
- Single Facility Due Date Setting with Multiple Customer Classes
- A Broader View of the Job-Shop Scheduling Problem
- Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues
- Lean Control for Make‐to‐Order Companies: Integrating Customer Enquiry Management and Order Release
- Some Tactical Problems in Digital Simulation
- A Simulation Study of Predictable Due-Dates
- An Economic Evaluation of Job Shop Dispatching Rules
- Estimating Sample Size in Computing Simulation Experiments
- Note—A Comparison of Capacity Planning Techniques in a Job Shop Control System
- Due-Dates and Instantaneous Load in the One-Machine Shop
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 29(7) · 799–816
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.29.7.799
- 저자Jwm Will Bertrand