46
피인용
5.3
FWCI
4
IS/마케팅/OM 탑저널 피인용
0
IS/마케팅/OM 탑저널 참고문헌
- 주제생산 계획과 일정 · 생산·최적화
01Abstract
In Part II, the CLSP Heuristic of Part I is extended to include variable capacity constraints—in this case the ability to adjust workforce levels and to employ overtime. The paper concludes with computational results for both the fixed and variable capacity heuristics.
02연구 흐름
불러오는 중…
03비슷한 논문
- Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
- Improved Rolling Schedules for the Dynamic Single-Level Lot-Sizing Problem
- Lot Sizing in Serial Assembly Systems with Multiple Constrained Resources
- Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines
- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
- The Capacitated Lot-Sizing Problem with Linked Lot Sizes
- Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- Heuristics for Multilevel Lot-Sizing with a Bottleneck
04이후 연구
- Capacitated Lot Sizing with Setup Times
- A Lagrangean Relaxation Approach for Very-Large-Scale Capacitated Lot-Sizing
- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
- Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems
05선행 연구
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
06서지 정보
- 저널Management Science · 21(10) · 1194–1203
- 토픽Advanced Manufacturing and Logistics Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.21.10.1194
- 저자Elizabeth Newson