The elapsed time to complete a scheduled task is expressed as a function of the completion times of the component tasks and the path matrix of the scheddule graph. The schedule function is interpreted geometrically as a polyhedron. If the scheduled activities have random completion times, the probability distribution of the time to complete the entire task is found by integrating over the contours of the polyhedron. Composite schedule functions are represented by algebraic formulae which are applicable in both the probabilistic and non-probabilistic cases. A method for joint control of cost and schedule is presented.
02연구 흐름
불러오는 중…
03비슷한 논문
- An Algorithm for the Construction and Evaluation of Feasible Schedules
- Scheduling with Random Service Times
- A Structural Method of Computing Project Cost Polygons
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
- Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions
- A Statistical Theory for Pert in Which Completion Times of Activities are Inter-Dependent
- Scheduling with Testing
- Mathematical Programming and Service Scheduling
- A Polyhedral Approach to Simplified Crew Scheduling and Vehicle Scheduling Problems
- Optimum Time Compression in Project Scheduling
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 11(2) · 289–307
- 토픽Manufacturing Process and Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.11.2.289
- 저자J. O. Mayhugh