For a project that consists of numerous jobs subject to technological ordering restrictions the polygon representing project cost versus completion time is to be determined when the normal and crash completion times are known for each job and the cost of doing the job varies linearly between these times. A linear programming formulation of this problem was given by Kelley [Kelley, J. E., Jr. 1961. Critical-path planning and scheduling: Mathematical basis. Oper. Res. 9 296–320.] and a network flow formulation by Fulkerson [Fulkerson, D. R. 1961. A network flow computation for project cost curves. Management Sci. 7 (2, January) 167–178.]. Since the traditional mathematical background of civil engineers includes neither linear programming nor network flow theory, these methods are not as widely used in the building industry as they deserve. This paper shows that Fulkerson's algorithm can be given a structural interpretation using concepts that are familiar to civil engineers.
불러오는 중…
- A Network Flow Computation for Project Cost Curves
- Dynamic Programming Models of the Nonserial Critical Path-Cost Problem
- Decomposition of Project Networks
- Critical Path Problems with Concave Cost-Time Curves
- A Dynamic Programming Solution to Cost-Time Tradeoff for CPM
- Optimum Time Compression in Project Scheduling
- On the Mathematical Theory of Schedules
- The Single Machine Problem with a Quadratic Cost Function of Completion Times
- A Simple CPM Time-Cost Tradeoff Algorithm
- Total Cost Control in Project Management via Satisficing
- 저널Management Science · 9(3) · 394–404
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.9.3.394
- 저자William Prager