A Functional Equation and its Application to Resource Allocation and Sequencing Problems
인용
416
피인용
7.6
FWCI
6
IS/마케팅/OM 탑저널 피인용
0
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
A functional equation, similar to that formulated for the knapsack problem, is applied to the solution of a problem of resource allocation in critical path scheduling, and to a variety of single-machine sequencing problems with deadlines and loss functions. Among these are: minimization of the weighted number of tardy jobs, maximization of weighted earliness, minimization of tardiness with respect to common relative and absolute deadlines, and minimization of weighted tardiness with respect to a common deadline. Extensions to multiple-machine sequencing problems are discussed, and the sequencing of two machines in series is treated in detail.
02연구 흐름
불러오는 중…
03비슷한 논문
- A Problem in Single-Machine Sequencing with Nonlinear Delay Costs
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- The Discrete Resource Allocation Problem in Flow Lines
- On Sequencing <i>n</i> Jobs on One Machine to Minimize the Number of Late Jobs
- The Single Machine Problem with a Quadratic Cost Function of Completion Times
- A Sequencing Problem with Release Dates and Clustered Jobs
- The Sequencing Problem
- Solving Project Scheduling Problems by Minimum Cut Computations
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- The Single Machine Problem with Quadratic Penalty Function of Completion Times: A Branch-and-Bound Solution
04이후 연구
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- Variance Minimization in Single Machine Sequencing Problems
- Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late Jobs
- The Effects of Multitasking on Operations Scheduling
- Scheduling with present bias
- Single Machine Scheduling with Deadlines to Minimize the Weighted Number of Tardy Jobs
05선행 연구
참고문헌 정보가 아직 없습니다. 최근 논문은 OpenAlex에 참고문헌이 늦게 들어오며, 들어오면 매주 갱신 때 반영됩니다.
06서지 정보
- 저널Management Science · 16(1) · 77–84
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.16.1.77
- 저자Eugene L. Lawler, Joann Moore