This paper addresses the problem of n jobs to be scheduled on a single machine in such a way that flow time variation is minimized. When the measure of variation is total absolute difference of completion times (TADC) the problem is shown to be quite simple. Sufficient conditions are shown for minimal TADC and a simple method for generating an optimal solution is provided. When the measure of variation is variance of flow time the problem is much more difficult. For this case a heuristic method for scheduling is proposed. The heuristic is simple and provides solutions which compare favorably with others found in the literature.
02연구 흐름
불러오는 중…
03비슷한 논문
- Minimising Waiting Time Variance in the Single Machine Problem
- Minimizing the Time-in-System Variance for a Finite Jobset
- Minimizing Single-Machine Completion Time Variance
- Variance Minimization in Single Machine Sequencing Problems
- Batching to Minimize Flow Times on Parallel Heterogeneous Machines
- Batching to Minimize Flow Times on One Machine
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques
- Sequencing Two-Machine Flow-Shops with Finite Intermediate Storage
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- Even-Flow, A Scheduling Method for Reducing Lateness in Job Shops
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 27(12) · 1453–1459
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.27.12.1453
- 저자John J. Kanet