116
피인용
1.8
FWCI
5
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
There are a finite number of jobs to be scheduled on a single machine. All jobs are available from the start and the objective is to sequence the jobs so that the time-in-system (or equivalently, the completion time) variance is minimized. A number of necessary conditions for an optimal sequencing (which for small jobsets turn out to be sufficient) are presented.
02연구 흐름
불러오는 중…
03비슷한 논문
- Minimizing Single-Machine Completion Time Variance
- Minimising Waiting Time Variance in the Single Machine Problem
- Minimizing Variation of Flow Time in Single Machine Systems
- Variance Minimization in Single Machine Sequencing Problems
- Scheduling to Minimize Maximum Workload
- The Sequencing Problem
- An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Batching to Minimize Flow Times on One Machine
- Note—Sequencing <i>n</i> Jobs on <i>m</i> Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- On Sequencing <i>n</i> Jobs on One Machine to Minimize the Number of Late Jobs
04이후 연구
- Minimising Waiting Time Variance in the Single Machine Problem
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- Minimizing Variation of Flow Time in Single Machine Systems
- Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs
- Minimizing Single-Machine Completion Time Variance
05선행 연구
06서지 정보
- 저널Management Science · 21(5) · 540–543
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.21.5.540
- 저자Linus E. Schrage