Sequencing Two-Machine Flow-Shops with Finite Intermediate Storage
Sujit K. Dutta, Andrew A. Cunningham
인용
- 주제작업장 일정 최적화 · 생산·최적화
The deterministic N-job two-machine flow-shop sequencing problem with finite intermediate storage is considered with the objective of minimizing the total processing time. A dynamic programming procedure is presented whereby an optimal solution to the problem may be obtained. Since the storage and computation time requirements for the solution of this model are large, it is modified so as to give a suboptimal recursive procedure which yields good solutions with much less computational effort. A further approximate method based on the technique of successive approximations is shown to provide an alternative means for tackling large problems. In addition, several new results are derived for the particular case where the buffer capacity is zero.
불러오는 중…
- Note—Sequencing with Finite Intermediate Storage
- Job Shop Sequencing Problem on Two Machines with Time Lag Constraints
- Batching to Minimize Flow Times on One Machine
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Batching to Minimize Flow Times on Parallel Heterogeneous Machines
- Flowshop Sequencing Problem with Ordered Processing Time Matrices
- Minimizing Variation of Flow Time in Single Machine Systems
- Focused Scheduling in Proportionate Flowshops
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- A Note on Stochastic Shop Models in Which Jobs have the Same Processing Requirements on Each Machine
- The Sequencing Problem
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 21(9) · 989–996
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.21.9.989
- 저자Sujit K. Dutta, Andrew A. Cunningham