175
피인용
4.1
FWCI
6
IS/마케팅/OM 탑저널 피인용
7
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
The variance of flow-time and variance of waiting-time performance measures are analyzed for the single machine sequencing problem. These measures are compared and contrasted to the performance measures of mean flow-time and mean waiting-time. In particular, while the two mean performance measures attain their minimums at the same job sequence, it is shown that the sequence that minimizes the variance of flow-time is antithetical to the sequence that minimizes the variance of waiting-time. However, the minimum values of the two variance measures are equal. Relationships are also derived for the special problems where either all the job processing-times are equal or all the job weights are equal.
02연구 흐름
불러오는 중…
03비슷한 논문
- Minimising Waiting Time Variance in the Single Machine Problem
- Minimizing Variation of Flow Time in Single Machine Systems
- Minimizing the Time-in-System Variance for a Finite Jobset
- Minimizing Single-Machine Completion Time Variance
- Batching to Minimize Flow Times on One Machine
- Sequencing Two-Machine Flow-Shops with Finite Intermediate Storage
- Note—A Note on Single Machine Sequencing with Random Processing Times
- Algoristics for Single-Machine Sequencing with Precedence Constraints
- A Lagrangean Based Branch and Bound Algorithm for Single Machine Sequencing with Precedence Constraints to Minimize Total Weighted Completion Time
- The Single Machine Problem with a Quadratic Cost Function of Completion Times
04이후 연구
- Minimizing the Time-in-System Variance for a Finite Jobset
- Minimising Waiting Time Variance in the Single Machine Problem
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- Minimizing Variation of Flow Time in Single Machine Systems
- Heuristics for Multimachine Scheduling Problems with Earliness and Tardiness Costs
- Minimizing Single-Machine Completion Time Variance
05선행 연구
- A Functional Equation and its Application to Resource Allocation and Sequencing Problems
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
06서지 정보
- 저널Management Science · 18(9) · 518–528
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.18.9.518
- 저자Alan G. Merten