ms·1973년 1월 1일
The Effectiveness of Three Heuristic Rules for Job Sequencing in a Single Production Facility
Ronald D. Haynes, C. A. Komar, Jack Byrd
인용
16
피인용
2.0
FWCI
0
IS/마케팅/OM 탑저널 피인용
1
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
This paper examines the effectiveness of three heuristic rules used in production sequencing where the objective is to minimize the downtime due to setup changes. The effectiveness of these heuristic rules was evaluated under various conditions of job size and setup time distribution. The results of this analysis indicate that job conditions do affect the effectiveness of these three rules.
02연구 흐름
불러오는 중…
03비슷한 논문
- Three Heuristic Rules for Sequencing Jobs to a Single Production Facility
- Heuristics in Job Shop Scheduling
- A Comparative Evaluation of Heuristic Line Balancing Techniques
- Search and Simulation Selection of a Job-Shop Sequencing Rule
- An Evaluation of Flow Shop Sequencing Heuristics
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
- Sequencing Rules and Due-Date Assignments in a Job Shop
- An Algorithm for Solving Job Sequencing Problems
- A Greedy Heuristic for Single Machine Sequencing with Precedence Constraints
04이후 연구
아직 이 논문을 인용한 탑저널 논문이 없습니다.
05선행 연구
06서지 정보
- 저널Management Science · 19(5) · 575–580
- 토픽Assembly Line Balancing Optimization · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.19.5.575
- 저자Ronald D. Haynes, C. A. Komar, Jack Byrd