The technique described in this paper was devised for sequencing jobs on individual machines having characteristics of: (1) high job changeover costs; (2) small backlogs (10-20 jobs); (3) occasional “rush” orders. The algorithm starts with four-job sequences and from these constructs five-job sequences; from the five-job sequences, six-job sequences are constructed, and so on. At each stage, a large fraction of sequences are eliminated from further consideration. This elimination process makes the computation feasible because the number of all possible sequences becomes unmanageably large, even for small problems. The technique always provides a minimum cost sequence. It also permits determination of optimum sequences of backlog sub-sets; thus, rush orders can be accommodated and anticipated changes in the job backlog can be recognized.
불러오는 중…
- A Heuristic Algorithm for the <i>n</i> Job, <i>m</i> Machine Sequencing Problem
- The Sequencing Problem
- An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- <i>N</i>-Job, One Machine Sequencing Problems Under Uncertainty
- Three Heuristic Rules for Sequencing Jobs to a Single Production Facility
- Sequencing to Minimize Work Overload in Assembly Lines with Product Options
- The Single Machine Problem with a Quadratic Cost Function of Completion Times
- On Sequencing <i>n</i> Jobs on One Machine to Minimize the Number of Late Jobs
- Search and Simulation Selection of a Job-Shop Sequencing Rule
- A Greedy Heuristic for Single Machine Sequencing with Precedence Constraints
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 13(8) · B–454
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.13.8.b454
- 저자J. T. Presby, M. L. Wolfson