We present a greedy heuristic for the n job/1 machine scheduling problem with precedence constraints. This method is useful whenever the manager's optimization criteria is the sum of weighted or unweighted completion times, the sum of weighted or unweighted flow times, (with or without release dates), the sum of weighted or unweighted working times, the sum of weighted or unweighted lateness, average completion time, average flow time, average waiting time or average lateness. The greedy heuristic found the optimal solution for 58 of 68 test problems for which a branch and bound method was used to find the optimal solution. The heuristic is, of course, much easier to implement (and executes in less time). The greedy heuristic fared well in comparison with a simple myopic heuristic presented by Morton and Dharan (Morton. T. E., B. G. Dharan. 1978. Algoristics for single machine sequencing with precedence constraints. Management Sci. 24 (10) 1011–1020.).

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보