Among network techniques recently widely employed in program management, Pert is addressed to the problem of assessing the manager's chances of completing a project on time. Theory and monte carlo simulation have shown that the Pert method yields results which are biased high, and this paper discusses a real example involving conditions under which the bias is very large. The manager is thus grossly misled into thinking his chances are very good, when in reality they are very poor. If the manager's network has multiple parallel paths with relatively equal means and large variances, Pert calculations will be considerably biased. Simulation can be utilized to estimate the distribution of completion time in this case, and guide the manager in appraising and controlling his chances of completion.
불러오는 중…
- A Statistical Theory for PERT Critical Path Analysis
- Bayesian Point Estimation and the PERT Scheduling of Stochastic Activities
- A Statistical Theory for Pert in Which Completion Times of Activities are Inter-Dependent
- On the Expected Duration of PERT Type Networks
- Better Estimation of PERT Activity Time Parameters
- Risk-Taking in Critical Path Analysis
- Resource Allocation in a PERT Network Under Continuous Activity Time-Cost Functions
- Approximating the Criticality Indices of the Activities in PERT Networks
- Reply—A Note on PERT Assumptions
- Note—A Note on Pert Times
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 13(4) · B–194
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.13.4.b194
- 저자A. R. Klingel