The concept of maximising present value is applied to the timing of activities in a network. The mathematical form of the problem is that of maximising a nonlinear function subject to linear constraints and can be solved as a succession of linear programmes. By application of duality principles the problem can be treated as a form of maximum value flow problem in which discounted cash flows are distributed along arcs from pay events to receipt events. The solution is aided by the “equilibrium theorem” of dual linear programming in that in the optimum condition flows occur only along arcs whose corresponding activity has zero float. The flows which occur in the optimally scheduled solution are directly proportional to the marginal cost which would be incurred by lengthening the activity corresponding to the arc along which the flow occurs. Some implications derived from the model are discussed and a number of possible applications are proposed.
불러오는 중…
- A Note on Parametric Network Flows
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- A Primal Algorithm to Solve Network Flow Problems with Convex Costs
- A Min Cost Flow Solution for Dynamic Assignment Problems in Networks with Storage Devices
- Multicommodity Network Flows with Probabilistic Losses
- Note—Some Equivalent Objectives for Dynamic Network Flow Problems
- A Network Flow Computation for Project Cost Curves
- A Suggested Computation for Maximal Multi-Commodity Network Flows
- Least <i>d</i>-Majorized Network Flows with Inventory and Statistical Applications
- Solving Project Scheduling Problems by Minimum Cut Computations
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- Project Contracts and Payment Schedules: The Client's Problem
- On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints
- A Comparison of Heuristics for Scheduling Projects with Cash Flows and Resource Restrictions
- Project Evaluation and Selection with Task Failures
- The Impact of Contractor Behavior on the Client’s Payment-Scheduling Problem
- Optimal Time-Cost Trade-Offs in GERT Networks
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 16(5) · 357–373
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.16.5.357
- 저자A. H. Russell