Solving Project Scheduling Problems by Minimum Cut Computations
Rolf H. Möhring, Andreas S. Schulz, Frederik Stork, Marc Uetz
인용
- 주제작업장 일정 최적화 · 생산·최적화
In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in manufacturing, production planning, project management, and elsewhere. It is one of the most intractable problems in operations research, and has therefore become a popular playground for the latest optimization techniques, including virtually all local search paradigms. We show that a somewhat more classical mathematical programming approach leads to both competitive feasible solutions and strong lower bounds, within reasonable computation times. The basic ingredients of our approach are the Lagrangian relaxation of a time-indexed integer programming formulation and relaxation-based list scheduling, enriched with a useful idea from recent approximation algorithms for machine scheduling problems. The efficiency of the algorithm results from the insight that the relaxed problem can be solved by computing a minimum cut in an appropriately defined directed graph. Our computational study covers different types of resource-constrained project scheduling problems, based on several notoriously hard test sets, including practical problem instances from chemical production planning.
불러오는 중…
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- A Branch and Bound Algorithm for Minimizing Cost in Project Scheduling
- A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach
- Scheduling Resource-Constrained Projects Competitively at Modest Memory Requirements
15 / 80편
- Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach
- A Selection Problem of Shared Fixed Costs and Network Flows
- Cash Flows in Networks
- Notes—On a Selection Problem
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 49(3) · 330–350
- 토픽Resource-Constrained Project Scheduling · Management Science and Operations Research
- DOI10.1287/mnsc.49.3.330.12737
- 저자Rolf H. Möhring, Andreas S. Schulz, Frederik Stork, Marc Uetz