Scheduling to Minimize the Number of Late Jobs When Set-Up and Processing Times are Uncertain
Management Science
49
피인용
4.1
FWCI
1
IS/마케팅/OM 탑저널 피인용
9
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
The n job, one-machine scheduling problem is considered where set-up and processing times are random and the objective is to minimize the number of late jobs. In the deterministic case, Moore's algorithm is known to produce an optimal schedule. A chance-constrained formulation of the nondeterministic problem is derived in which a job is processed if the probability that it will be completed prior to its due date is greater than a specified level. A deterministic equivalent problem is achieved to which application of a modification of Moore's algorithm is proven to produce an optimal schedule.
02연구 흐름
불러오는 중…
03비슷한 논문
불러오는 중…
04이후 연구
불러오는 중…
05선행 연구
불러오는 중…
06서지 정보
- 저널Management Science · 19(11) · 1283–1288
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.19.11.1283
- 저자Stephen J. Balut