The problem of cyclic scheduling of two hoists is defined as follows. There are N + 1 workstations, S0, S1, …, SN, and two identical hoists that move jobs between stations. Jobs are identical and each job has to visit all stations in the order that stations are numbered. It is assumed that the hoist traveling times between stations are given constants. Each station can hold one job at a time, and each job must remain at station Si, for a period of at least ai and at most bi time units. Both ai and bi, i = 2, …, N, are given constants. Define mi, 0 ≤ i ≤ N, to be a move of a job from Si to Si+1. A cyclic schedule determines the order of N + 1 moves, mi, i = 0, 1, …, N, an assignment of these moves to hoists, and the start time of the moves in a cycle. The problem is to find a cyclic schedule that minimizes the total time (the cycle time) to complete all the N + 1 moves. Previous approaches toward solving cyclic hoist scheduling problems have been limited to single-hoist cases. In this paper, we propose a heuristic algorithm that finds schedules for systems with two hoists, and discuss an extension to the problem with more than two hoists. The algorithm uses a partitioning approach by which a system is partitioned into two sets of contiguous workstations and each hoist is assigned to a set. A sequence of alternative partitions is evaluated. For each partition, two single-hoist subproblems are formed and the optimal (minimal) cycle time for each subproblem is independently computed. The two optimal single-hoist schedules are then coupled and refined into a feasible two-hoist schedule with a common-cycle time for both hoists. The best of the generated schedules, that results in the minimum common-cycle time among the different partitions, is given as the final solution. Computational experience with both randomly generated problems and a benchmark problem arising from a real system is discussed.
불러오는 중…
- A Crane Scheduling Problem in a Computer-Integrated Manufacturing Environment
- Optimal Scheduiing of Two Consecutive Idle Periods
- Scheduling to Minimize Maximum Workload
- Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs
- An Algorithm for the Construction and Evaluation of Feasible Schedules
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
- Cyclical Schedules for Capacitated Lot Sizing with Dynamic Demands
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- Heuristic Techniques for Simultaneous Scheduling of Production and Distribution in Multi-Echelon Structures: Theory and Empirical Comparisons
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 37(12) · 1629–1639
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.37.12.1629
- 저자Lei Lei, Tzyh-Jong Wang