- 주제작업장 일정 최적화 · 생산·최적화
In 1964, Eastman, Even, and Isaacs (EEI) presented a polynomial time lower bound for the NP-hard problem of scheduling n jobs on m available and identical processors to minimize weighted flow time. A general bound, of which the EEI bound is a special case, is proposed. Four new bounds for the identical processor problem are given. All of the new bounds can be applied to problems with variable processor ready times. The EEI bound is limited to problems where all processors are initially available at the same time. Two of the four new bounds are shown to dominate the EEI bound. The two other bounds are found to be effective for a particular problem class. Two polynomial time lower bounds for problems with nonidentical processors are introduced. One bound is applicable to the uniform processor problem, the other bound can be applied to the general processor problem. No bounds have previously been proposed for these problems.
불러오는 중…
- Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors
- Scheduling Independent Tasks on Parallel Processors
- Economic Lot Scheduling for Multiple Products on Parallel Identical Processors
- Bounds for the Optimal Scheduling of <i>n</i> Jobs on <i>m</i> Processors
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques
- Batching to Minimize Flow Times on Parallel Heterogeneous Machines
- Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late Jobs
- Minimizing Makespan with Bimodal Processing Time Distributions
- Modeling a Multiprocessor System with Preemptive Priorities
- Parallel Machine Scheduling: Processing Rates Dependent on Number of Jobs in Operation
아직 이 논문을 인용한 탑저널 논문이 없습니다.
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 38(1) · 124–136
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.38.1.124
- 저자Scott T. Webster