ms·1964년 11월 1일
Bounds for the Optimal Scheduling of n Jobs on m Processors
Willard L. Eastman, Shimon Even, I. Martin Isaacs
인용
157
피인용
10.1
FWCI
2
IS/마케팅/OM 탑저널 피인용
2
IS/마케팅/OM 탑저널 참고문헌
- 주제작업장 일정 최적화 · 생산·최적화
01Abstract
The problem of scheduling n jobs on m identical processors has been introduced by R. McNaughton, but as yet no efficient algorithm has been found for determining an optimal sequencing of jobs. In this paper lower and upper bounds are given for the cost of an optimal schedule. Since the two bounds are not far apart, they may be helpful in practical scheduling problems. A procedure is described for obtaining a schedule which costs less than the given upper bound.
02연구 흐름
불러오는 중…
03비슷한 논문
- Note—Sequencing <i>n</i> Jobs on <i>m</i> Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- Evaluation of a Heuristic for Scheduling Independent Jobs on Parallel Identical Processors
- Scheduling Jobs with Exponentially Distributed Processing Times on Two Machines with Resource Constraints
- Scheduling to Minimize Maximum Workload
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- Scheduling Independent Tasks on Parallel Processors
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques
- The Sequencing Problem
- An <i>n</i> Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- On Sequencing <i>n</i> Jobs on One Machine to Minimize the Number of Late Jobs
04이후 연구
05선행 연구
06서지 정보
- 저널Management Science · 11(2) · 268–279
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.11.2.268
- 저자Willard L. Eastman, Shimon Even, I. Martin Isaacs