IS Atlas
ms·1990년 3월 1일

Economic Lot Scheduling for Multiple Products on Parallel Identical Processors

José Juan Carreño

Management Science

69
피인용
4.5
FWCI
2
IS/마케팅/OM 탑저널 피인용
23
IS/마케팅/OM 탑저널 참고문헌
01Abstract

This paper deals with an identical multiprocessor, multiproduct, lot-size scheduling problem under deterministic conditions. The problem is an extension of the single-processor ELSP problem. The objective is to minimize the average production and inventory costs per unit time subject to constraints of no shortages and no interference among the products. A mathematical formulation for the problem is given. A heuristic procedure, which extends the Common Cycle approach for a single processor, is suggested and computational results are reported. Upper and Lower bounds are developed and used to measure the effectiveness of the procedure.

02연구 흐름

불러오는 중…

03비슷한 논문

불러오는 중…

04이후 연구

불러오는 중…

05선행 연구

불러오는 중…

06서지 정보