Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times
J.M.J. Schutten, Steef van de Velde, W.H.M. Zijm
인용
- 주제작업장 일정 최적화 · 생산·최적화
We address the NP-hard problem of scheduling n independent jobs with release dates, due dates, and family setup times on a single machine to minimize the maximum lateness. This problem arises from the constant tug-of-war going on in manufacturing between efficient production and delivery performance, between maximizing machine utilization by batching similar jobs and maximizing customers' satisfaction by completing jobs before their due dates. We develop a branch-and-bound algorithm, and our computational results show that it solves almost all instances with up to about 40 jobs to optimality. The main algorithmic contribution is our lower bounding strategy to deal with family setup times. The key idea is to see a setup time as a setup job with a specific processing time, release date, due date, and precedence relations. We develop several sufficient conditions to derive setup jobs. We specify their parameters and precedence relations such that the optimal solution value of the modified problem obtained by ignoring the setup times, not the setup jobs, is no larger than the optimal solution value of the original problem. One lower bound for the modified problem proceeds by allowing preemption. Due to the agreeable precedence structure, the preemptive problem is solvable in O(n log n) time.
불러오는 중…
- Note. Satisfying Due Dates in Large Job Shops
- The One-Machine Problem with Delayed Precedence Constraints and its Use in Job Shop Scheduling
- Single Machine Scheduling with Deadlines to Minimize the Weighted Number of Tardy Jobs
- Note—Sequencing <i>n</i> Jobs on <i>m</i> Machines to Minimise Maximum Tardiness: A Branch-and-Bound Solution
- A Sequencing Problem with Release Dates and Clustered Jobs
- Preemptive Scheduling of Uniform Machines by Ordinary Network Flow Techniques
- Minimizing Single-Machine Completion Time Variance
- Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late Jobs
- Finding Optimal Material Release Times Using Simulation-Based Optimization
- Scheduling to Minimize the Number of Late Jobs When Set-Up and Processing Times are Uncertain
15 / 19편
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 42(8) · 1165–1174
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.42.8.1165
- 저자J.M.J. Schutten, Steef van de Velde, W.H.M. Zijm