The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem
인용
- 주제작업장 일정 최적화 · 생산·최적화
We consider the problem of minimizing project duration in an environment where each project activity can be executed by a number of different flexible resources. The capabilities of the flexible resources are modeled using a binary activity-resource matrixAcalled theavailabilitymatrix. Activity durations are known deterministically. We develop tight lower bounds and a variety of heuristics accompanied with extensive computational tests regarding their performance. It is shown that our algorithms consistently perform near optimally. Using these heuristics, we perform experiments on the effect of operating flexibility on project duration, where resource flexibility is measured by the number of resources available per activity, and the form of the availability matrixA. Our experiments lead to important managerial guidelines regarding the role of resource flexibility on project duration. For instance, it is found that when the flexible capabilities of the resources are evenly distributed across the activities, small improvements in resource flexibilities provide nearly the same benefits in project duration as a system of fully flexible resources.
불러오는 중…
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Scheduling Parallel Manufacturing Cells with Resource Flexibility
- Flow Shop Scheduling with Partial Resource Flexibility
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Scheduling of Project Networks by Job Assignment
- A Variational Study of Optimal Resource Profiles
아직 이 논문을 인용한 탑저널 논문이 없습니다.
15 / 26편
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Scheduling of Project Networks by Job Assignment
- The Analysis of Activity Networks Under Generalized Precedence Relations (GPRs)
- Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 탑저널 밖 논문
- 저널Management Science · 49(6) · 718–732
- 토픽Scheduling and Optimization Algorithms · Industrial and Manufacturing Engineering
- DOI10.1287/mnsc.49.6.718.16027
- 저자George L. Vairaktarakis